| |
No
more splices.
If labor is a cost, the saved time
turns into saved money.
- 3
minutes: are saved directly with the faster
building time because the RINGTREAD System doesn't
involve: tread measuring and cutting, the manual application
and the splicing operation.
- 2 minutes: are saved with the elimination
of the tread loading and unloading phases (that cannot
be done by hand but using a hoist because strips weigh
more than 60 lbs.) and the elimination of waste handling.
The final result is 5 minutes saved, time perfectly
optimized.
|
|